CCS | Vattenfall pessimistic about the future for the Jänschwalde carbon capture demo plant - CEO

- The Jänschwalde CCS-demo plant would require an investment of 1.5-1.6 billion Euros
- 2016 is too soon.
- Vattenfall wants limited liability after CO2-storage site closure.